Dalja mine dismantle
Some demolitions carried
Scrap choppers |
|
 |
We are proud to have 100 contracts successfully finalized and in complete safety. The most representative works executed by our company are mentioned in the reference list. |
Dismantle of civil and industrial constructions (with explosives or mechanical):
- Dismantle of the Blast Furnaces no.4,5 ,7,8,9 from within S.C. Siderurgica S.A.Hunedoara
- Dismantle of the Sinter Bay no. 1 and 2 from within S.C. Siderurgica S.A. Hunedoara
- Dismantle of the O.S.M. Bay no. II from within S.C. Siderurgica S.A. Hunedoara
- Dismantle through works of shooting some foundations found on the location of the former coal mill, block no. 3, from within Steam Power PLant Mintia – Deva – The deallocation by mechanized means of the Industrial Furnaces
- Dismantle of the existing foundations on the location of the future foundations, girdle and fans, which are between Electrolysis Bays no. 6 and 7 from within S.C. ALRO S.A. Slatina
- Dismantle of the foundations existed on the location of the future foundations for fans VRA and VRB from within S.C. CASIAL S.A. Deva – Heidelbergcement Group
- Breakings with explosive of about 5.000 t oversizes on hot metal from within S.C. Sidermet S.A. Calan
- Dismantle of cyclone tower, riflers furnace no. 2 and remaking-consolidation of the access ladder and elevator within Lafarge Romcim , Hoghiz working point
- Dismantle of the Palletization Bay and Car Garrage from within Lafarge Romcim, working point in Hoghiz
- Dismantle by cutting with oxigas flames of the smoke chimneys of the Heating Station, Certeju de Sus
- Dismantle by classic means of the block 105 studio apartments and of the block of non – family men (P+4) within the closing and cleaning works at the mine Ghelar Central
- Dismantle of the funicular path and of the loading and unloading stations within the closing and cleaning works at the mine Ghelar Central
- Dismantle with explosive of the administrative pavilion (P+3) and of the car pavilion from within Lafarge Romcim, working point Hoghiz
- Dismantle with seismic protection of the railway bridge crossing the European road from locality Simian, Turnu-Severin
- Dismantle of the resistance structure of the boiler room– Electric Station Paroseni
- Dismantle and cleaning of the Lime Plant - Moldocim Bicaz – Heidelbergcement Group
- Dismantle of Ledge and Bridge– Railway Station Sibiu
- Dismantle electric filter 1,3 , Elevators - Marna Station– Holcim S.A. Alesd
- Dismantle of the lime burning kilns, clay breakers, limestone breakers and overhead cranes – Holcim S.A. Alesd
- Dismantle with explosive of platforms from the interior of the Oxygen Plant Hunedoara
- Dismantle of the resistance structure of the boiler room – Electric Station Paroseni
- Dismantle BLAST FURNACE shop- floor – S.C. Combinatul Siderurgic Resita S.A. (Steel Plant Resita)
- Dismantle and cleaning of the old Cement factory: Moldocim Bicaz- Heidelbergcement Group
- Dismantle office building body‚ smoke chimney, clay breakers, Marna breakers– Holcim S.A.
- Dismantle Mechanical Storage Room – Comat S.A. Sibiu
- Dismantle Rolling Mill 800 – Mittal Steel Hunedoara
- Dismantle Raw materials Mills – Cement Factory Holcim Alesd
- Dismantle Water tower (water tank) from within – S.C. Protos S.A. Alba Iulia
- Dismantle by works of shooting of the CF (railway)support wall in the Draging area from Constanta Harbour
- Dismantle steel concrete foundations Sugar Factory – Tandarei, Ialomita County;
- Dismantle of deallocated buildings from within the Medicinal Alcohol Factory Alba Iulia – S. C. Vinalcool S.A. Alba Iulia
- Dismantle of the Bus station Deva – S.C. Quasar Industries S.R.L.
- Dismantle of the Station Petrom no. 5 – Deva – S.C. Ra- Stas Construct S.R.L. - Resita;
- Dismantle Electric Steel Shop no.2 – Mittal Steel Hunedoara
- Dismantle buildings, the former Furniture Factory - S.C. Mobinex S.A.- S.C. Moldconstruct S.R.L. Piatra-Neamt
- Dismantle and cleaning of the location of S.C. Contactoare Buzau – S.C. Kiz Projects Arad
- Dismantle by shooting works of the Caustic Soda Bay from within Uzina de Produse Sodice Govora (The Sodic Products Plant in Govora)
- Dismemberment and dismantle of the installations closed operationally from within Coke Chemical Plant ( coke gas exhausters, the raw ammonia water installation, coke gas primary cooling, coke gas final cooling, benzene distillation installation, benzene absorption installation, recirculation cooling water towers) – ArcelorMittal Galati
- Dismemberment and dismantle of the installations ( BOC 1, BOC 2, pearlite bunkers, liquid oxygen tank, argon gasometer) from within Linde Gaz Romania, ArcelorMittal Galati platform
- Dismantle, cleaning, evacuation of black oil and cutting large capacity basins from within Carpatcement Holding S.A. , Bicaz Factory
- Dismantle and recovery of scrap iron - OE I site – ArcelorMittal Hunedoara
Works of prepairing the field (purifying):
- Purifying works of the sie of the Electric Cables Production Bay - Lisa Draxlmaier Autopart ROMANIA– Hunedoara
- Purifying the site of the new production bay from within the Industrial Park Gorj- Pirelli & C. Ambiente Technology S.P.A.
- Prepairing the site SRM- Bumbesti-Jiu-RMR-Regel+Messtechnik Romania
- Abolishing constructions, installing and purifying on the site from Hunedoara – S.C. North West Plaza S.R.L.
|
|